Buena Vista Palace Hotel Cendyn ePlanner

Skip Navigation Links

Electrical
 

Electrical

All electrical distribution must meet National Electrical Code and Reedy Creek safety requirements. PSAV can assist you to ensure compliance. All power hookups will be the responsibility of the Hilton Orlando Buena Vista Palace through PSAV Electrical. Backstage cabling across exits and walkways must be covered with rubber mats and taped down to ensure safe egress. Frequently, the Fire Marshal representative will visit the hotel during productions to ensure these requirements are met.

All power cords must be clear of doorways and bridged or otherwise secured. Back-of-the-house entrances/exits are used by the Banquet Staff for service purposes. The Hotel requires the use of beige tape to tape down all cords on the floor. Black tape should be used for riser sections only.

Todd Jones
Director of Sales, PSAV
Office: 407-597-5254
Mobile: 407-947-7955
Email: Click Here

©2018 Cendyn. All Rights Reserved.
Buena Vista Palace Hotel | 1900 E. Buena Vista Drive, Lake Buena Vista, Florida 32830